Yuyao Ruihua Hardware siamna hmunpui a ni.

Please Choose Your Language

   Service line: 1.1. 

 (+86) 13736048924

You are here: In » Chanchin leh thil thleng . » Product chanchin thar . » 5 TRANSTICTION FITTING INSTALLATION AH TRANSTION FITTING THAWN THAWN THAWN THAWN THAWN THAWN THA

5 transition fitting installation tha tak neih theihna tura step pawimawh tak tak: Ruihua Hardware atanga expert guide

A rilru a buai em em a 6     , a rilru a hah em em bawk a, a rilru a buai em em bawk a. Hmun

zawhna zawt rawh .

Facebook Sharing button a awm bawk.
Twitter atanga Sharing button a awm bawk.
Line Sharing button a awm bawk.
WeChat hmanga Sharing tih a ni.
LinkedIn Sharing button a awm bawk.
Pinterest hmanga Sharing tih a ni.
WhatsApp Sharing button 1000 a awm bawk.
ShareHe Sharing button hi a awm em?

Hydraulic emaw pneumatic system eng pawhah chuan transition fitting hian critical junction point angin hna a thawk a ni. A install dan dik tak chu system integrity a awm theihna tur, leak venna tur, leh downtime man to tak tak pumpelh nan a pawimawh ber a ni. Installation flawed chuan safety leh performance a tichhe thei a, components quality sang ber pawh nise.

2K9-30 a ni.

As a leading  manufacturer of precision hardware components , Ruihua hardware chuan installation dik tak chu manufacturing quality ang bawkin a pawimawh tih a hrethiam a. He guide hian i transition fittings te chu a hun apianga dik tak leh rintlak taka dah a nih theih nan step pawimawh panga a tarlang a ni.


Step 1: Pre-Installation Inspection – A bul atanga a dik leh dik loh enfiah .

ngun taka enfiah hi installation hlawhtling tak dinna lungphum a ni. Assembly hmain, engtik lai pawhin:

Inventory Check: Part zawng zawng a awm leh awm loh leh accounted a nih leh nih loh enfiah rawh.

Visual Inspection: Component tin (taksa, seal, nut, bolt) te chu a chhiatna chhinchhiahna, a hrual, a hrual, a nih loh leh a natna te chu uluk takin enfiah rawh.

Dry Fit: Connection port te chu misalignment engmah awm lovin a inmil tawk em tih hriat nan preliminary alignment check tih tur a ni.

Ruihua Pro Tip: Component eng emaw a chhiat emaw, a bo emaw chuan installation kalpui ngai suh. Quality hi inspection atanga tan a ni.

1CB-18-08WD 1000 a ni.

Step 2: Sub-Assembly – A kalphung awlsam zawk .

Bench-a components te chu pre-assembling hmangin a tawp ber installation chu awlsam takin siam rawh.

Seal leh nut ang chi attachable parts te chu main fitting body-ah uluk takin an inzawm khawm a.

Smooth leh snug fit a nih ngei ngei tur a ni a, critical sealing surface tichhe thei tur handling tha tak tak awm lo tur a ni.

Ruihua Pro Tip: Pre-assembly dik tak chuan a tawp berah, a tam zawkah chuan a harsa zawk, system-a install a nih laiin tihsual a ti tlem.

9J-Cap a ni a.

Step 3: Bolting & Fastening – A rilru a buai em em a, a rilru a hah em em bawk a.

Hei hi precision pawimawh berna phase pawimawh ber a ni. Assembly chu bolt leh nut hmanga an secure dawnin:

Even Pressure: Star-pattern sequence hmang la, load distribution pawh a awm theih nan pass engemaw zatah diagonally opposed bolt te kha tihkhauh rawh.

Overtighttening tih loh tur: seal seal a awm theih nan torque value tarlan kha tight rawh.  Overtightening hi thil tihsual tlanglawn tak a ni a, thread a strip thei a, seal a crush thei a, fitting body a tichhe thei a, a tichhia thei bawk.

Ruihua Pro Tip: A tha ber tur chuan torque wrench hmang la. Kan fittings te hi torque specification dik tak atan engineer a ni a, chu chu kan thil siam nen kan pe a ni.


Step 4: Position siamrem – Alignment tha ber neih theih nan hma la rawh .

Fastened a nih chuan installed transition fitting final position chu siamrem leh rawh.

Pipe emaw hmanrua inzawmte nen a inmil dik a, residual stress awm lo a nih thu nemnghet rawh.

Natural, stress-free alignment hi hun rei tak chhunga rintlak leh performance atan a pawimawh hle.


Step 5: Performance Testing – A tawp berah chuan a tawp ber atan .

He non-negotiable final step hian installation process zawng zawng a tichiang vek a ni.

Pressure Test: System chu zawi zawiin pressurize-in leak test neih thin ang che. Connection point zawng zawng chu  leakage chhinchhiahna a awm leh awm loh ngun takin enfiah rawh ..

Final Check: Test leh depressurizing hnuah fastener zawng zawng chu a him reng em tih finfiah la, a hlim hmel a awm lo.

Ruihua Pro Tip: He performance test hi hlawhtling taka kan pass hnuah chauh system hi operational anga ngaih a nih chuan. Hei hi himna atana i guarantee hnuhnung ber (guarantee) a ni.

tempimage5zwnxn .


Thutlukna: Thil siamna lama quality, installation-


a precision transition fitting install hi a dik tak a ni a, bolt tihkhauh hna awlsam tak mai a ni lo. He step pangaa framework hi zawm la— enfiah, pre-assemble, fasten, align, leh test —chuan himna leh hnathawh theihna sang ber i siam thei ang.
-ah hian   Ruihua Hardware thil siamtu mai ni lovin thil dang tam tak kan nih theih nan kan inpeih a; Rinnawm takah chuan i partner kan ni. Kan components te hi precision-engineered for excellence an ni a, he guide hmang hian an theihna zawng zawnga an perform theih nan i enfiah thei bawk.
Ruihua hardware—chuan quality built in a awm a, performance chu a install dik a ni.



Inquiry thawn rawh .

Kan rawn biak theih reng e

 Tel: +86-574-62268512
 Fax: +86-574-62278081
 Phone: +86- 13736048924
 Email: ruihua@rhhardware.com
em em  a, a rilru a hah em em bawk a, a rilru a buai em em bawk a, a rilru a hah em em bawk a. 42 Xunqiao, Lucheng, Industrial Zone, Yuyao, Zhejiang, China

Sumdawnna awlsam zawk siam rawh .

Product quality hi Ruihua nunna a ni. Products chauh ni lovin, kan after-sales service pawh kan pe bawk.

A dang pawh a awm >

Chanchin leh thil thleng .

Message pakhat dah la .
Please Choose Your Language