Yuyao Ruihua Hardware siamna hmunpui a ni.
Email:
A rilru a buai em em a 6 , a rilru a hah em em bawk a, a rilru a buai em em bawk a. Hmun

As a leading manufacturer of precision hardware components , Ruihua hardware chuan installation dik tak chu manufacturing quality ang bawkin a pawimawh tih a hrethiam a. He guide hian i transition fittings te chu a hun apianga dik tak leh rintlak taka dah a nih theih nan step pawimawh panga a tarlang a ni.
Step 1: Pre-Installation Inspection – A bul atanga a dik leh dik loh enfiah .
ngun taka enfiah hi installation hlawhtling tak dinna lungphum a ni. Assembly hmain, engtik lai pawhin:
Inventory Check: Part zawng zawng a awm leh awm loh leh accounted a nih leh nih loh enfiah rawh.
Visual Inspection: Component tin (taksa, seal, nut, bolt) te chu a chhiatna chhinchhiahna, a hrual, a hrual, a nih loh leh a natna te chu uluk takin enfiah rawh.
Dry Fit: Connection port te chu misalignment engmah awm lovin a inmil tawk em tih hriat nan preliminary alignment check tih tur a ni.
Ruihua Pro Tip: Component eng emaw a chhiat emaw, a bo emaw chuan installation kalpui ngai suh. Quality hi inspection atanga tan a ni.

Bench-a components te chu pre-assembling hmangin a tawp ber installation chu awlsam takin siam rawh.
Seal leh nut ang chi attachable parts te chu main fitting body-ah uluk takin an inzawm khawm a.
Smooth leh snug fit a nih ngei ngei tur a ni a, critical sealing surface tichhe thei tur handling tha tak tak awm lo tur a ni.
Ruihua Pro Tip: Pre-assembly dik tak chuan a tawp berah, a tam zawkah chuan a harsa zawk, system-a install a nih laiin tihsual a ti tlem.

Step 3: Bolting & Fastening – A rilru a buai em em a, a rilru a hah em em bawk a.
Hei hi precision pawimawh berna phase pawimawh ber a ni. Assembly chu bolt leh nut hmanga an secure dawnin:
Even Pressure: Star-pattern sequence hmang la, load distribution pawh a awm theih nan pass engemaw zatah diagonally opposed bolt te kha tihkhauh rawh.
Overtighttening tih loh tur: seal seal a awm theih nan torque value tarlan kha tight rawh. Overtightening hi thil tihsual tlanglawn tak a ni a, thread a strip thei a, seal a crush thei a, fitting body a tichhe thei a, a tichhia thei bawk.
Ruihua Pro Tip: A tha ber tur chuan torque wrench hmang la. Kan fittings te hi torque specification dik tak atan engineer a ni a, chu chu kan thil siam nen kan pe a ni.
Fastened a nih chuan installed transition fitting final position chu siamrem leh rawh.
Pipe emaw hmanrua inzawmte nen a inmil dik a, residual stress awm lo a nih thu nemnghet rawh.
Natural, stress-free alignment hi hun rei tak chhunga rintlak leh performance atan a pawimawh hle.
He non-negotiable final step hian installation process zawng zawng a tichiang vek a ni.
Pressure Test: System chu zawi zawiin pressurize-in leak test neih thin ang che. Connection point zawng zawng chu leakage chhinchhiahna a awm leh awm loh ngun takin enfiah rawh ..
Final Check: Test leh depressurizing hnuah fastener zawng zawng chu a him reng em tih finfiah la, a hlim hmel a awm lo.
Ruihua Pro Tip: He performance test hi hlawhtling taka kan pass hnuah chauh system hi operational anga ngaih a nih chuan. Hei hi himna atana i guarantee hnuhnung ber (guarantee) a ni.

Engineering Excellence: Ruihua Hardware-in a siam dan tur dik tak thlir dan.
Precision Connected: Bite-type ferrule fittings hmanga siam engineering brilliance a ni.
Stop hydraulic leaks for good: Flawless connector sealing atana tips pawimawh 5
Crimp Quality Exposed: A side-by-side analysis i ngaihthah theih loh
ED vs. O-ring Face Seal Fittings: Hydraulic connection tha ber thlan dan
Hydraulic Fitting Face-Off: Nut hian quality chungchanga a phochhuah chu .